loading

No leakage of worry - free sealing solution.

E-mail: huanggu@188.com

how to rebuild a walbro carburetor

Walbro carburetor is one of the most popular carburetor brands on the market for people who eat weeds, leaf blowing machines and small gasoline engines for some chain saws.
Over time, almost all the vaporizers need to be rebuilt.
Small rubber parts become brittle and break, and small holes are blocked by debris.
By following a series of processes, you can rebuild the small carburetor in about an hour and leave the hard-earned cash in your pocket by doing it yourself.
Remove the carburetor from the small engine using the correct settings
Size Allen wrench.
Place the carburetor on a hard, flat surface covering several layers of newspaper.
Some of the gas may leak from the intake tube and the newspaper absorbs the wrong liquid.
Observe that there are two removable covers on the opposite side of the house.
One cover has four small screws and the other has only one large screw in the middle of the thick aluminum cover.
Remove four small screws from the carburetor housing using a small jeweler screwdriver.
Install the small cover and screws together to the side of the work area.
Using the sharp edge of the pock knife, carefully pry the rubber fuel pump gasket from the surface.
You can put this part aside for the time being.
Flip the carburetor and remove the large center screw on the thick cover.
Use the knife again to pry the rubber gasket off the shell.
Note that a small needle valve is placed under the gasket with a small plate and a smaller Philips head screw.
Using a small jewelry screwdriver, remove the fixing screw for the fixing needle valve.
When you pull the plate out of the shell with a small needle nose thin claw pliers, be aware that there is a very small spring under the plate.
This spring is not included in the rebuild kit, so don\'t release it.
Remove the plate, small metal bar, small spring and needle valve from the housing.
Please note that there is a small screen under this area with a diameter of about 3/8.
Pry open the screen loose with the tip of the knife.
Remove the small fuel control mixing screws marked \"Hi\" and \"Lo\" from the housing.
Put these screws aside and make sure that the small springs that surround the screws are consistent with the correct screws.
Spray the metal case thoroughly using the carburetor cleaner.
Pay special attention to small holes and drilling holes.
Connect the trail tube to the nozzle of the cleaner tank and rinse all openings in the metal casing.
Before assembling the reconstruction kit back into the carburetor, allow the carburetor to be completely dry.
Open the plastic bag for the reconstruction kit and list all the parts contained in the sealed bag.
You will notice that not all new parts match the one you removed.
The reconstruction kit for sale contains all parts of all Walbro carburetor.
Match the parts you have removed and put them in the newspaper.
Put the extra parts back in the plastic bag so they don\'t interfere with the reconstruction.
Replace the new part in the order you remove the new part.
Insert the new small filter screen and push it down with your fingers in order to properly place the screen on the raised edge of the round shell hole.
Replace the new plate, Rod arm and needle valve to the floating area.
The insertion of small springs can be a bit tricky, but please take a moment.
Put the case in the newspaper and then insert the screen into the machining hole.
Place the plate on the top of the spring, and then install the needle valve to the catch part of the plate.
When starting the small Philips head screw, the thin mouth clamp can help to fix the spring in place.
Install new washers in the needle valve area and tighten the thick aluminum cover with screws.
Assemble the \"Hi\" and \"Lo\" mixing screws back to the appropriate opening.
Close the screw valves completely and then turn them on for a rough adjustment of 1 turn.
Open the case and install a new diaphragm fuel pump.
The new pump may be a plastic composite, not a rubber composite that you remove.
Walbro has changed this section and the new one works fine.
Be sure to align the two small placement nail holes with the opening in the diaphragm.
Place the lid on the fuel pump area and tighten the small screws.
Install the modified carburetor on the small engine and try it.
In order to operate correctly, you may have to re-adjust the \"Hi\" and \"Lo\" speed mixing valves on the side of the carburetor.

GET IN TOUCH WITH Us
recommended articles
200 questions Info center Application
Mining Industry
Mainly used for mining equipment, transportation equipment, crushing equipment, grinding equipment, etc.The seal ring is required to have high wear resistance, good pressure resilience and high ductility;
Our company can produce mould and products.In order to improve productivrity, we import 4 
CNC machine. our customer can get products quickly.
Our o-ring have been tested according to the requirements of NORSOK M-710 Edition 3/ISO 23936-2.(Rapid gas decompression resistance).the test passed. This kinds of o-rings are widely used by pump.
Chemical Industry
Mainly used for reactor, pipe, pump, valve and storage and transportation equipment;The main requirements of sealing ring corrosion, high temperature resistance and other properties.
Equipment Industry
Used in hydraulic system, rotary system, pipe joint, quick plug valve and other components;Seal ring is required to have good deformation resistance, high tensile properties.
Oil & Gas Industry
Mainly used in oil and gas production equipment、refining and chemical equipment、conveying equipment and so on; The seal ring is required to be corrosion resistant, high temperature resistant, explosion-proof and other properties.
Metallurgical Industry
Hydraulic seal, rotary seal, pump seal, etc.
Home Appliance Industry
Used for sealing of pipe joints, caps and rotating parts; The seal is required to have food grade, corrosion resistance, high speed and other properties.
Automotive Industry
It is used on gear box, brake, shield, wheel hub, water pump, etc
New Energy Industry
Sealing of rotary parts, connecting parts, etc
no data

Suzhou Ultimate Sealing Technology Co.,Ltd is a collection R&D, production, sales in one of the enterprises.

Contact us

Contact Person: Mr.Huang
Tel: +86-13338652764  
Company Tel: +86-0512-65792190
Fax: +86-0512-65793583
E-mail: huanggu@188.com
Wechat: 13338652764 
Office Add: Suzhou Industrial Park Zhongxin Ecological Building 
Copyright © 2025 Suzhou Ultimate Sealing Technology Co.,Ltd. | Sitemap  |  Privacy Policy
Customer service
detect